Strata Approval for Renovations - What You Need to Know
Do you need strata approval to modify your lot?
Planning a renovation? Whether installing air-conditioning, renovating a kitchen or adding a patio, check what approvals are required before starting work.
The process below explains changes to the lot (not common property). Make sure you check your strata plan or check with your Strata Manager to confirm the boundaries of the strata plan and what approval process is required.
Do I need approval?
You may need approval from:
- Local Council: Planning approval or a building permit may be required.
- Strata Company: Approval may be required under the Strata Titles Act 1985 (WA), your scheme’s by-laws, or where common property is affected.
Council approval does not replace strata approval.
When is strata approval required?
Under Section 87 (of the Strata Titles Act), formal approval may be required for structural alterations such as:
- Patios, sheds or carports.
- Extensions or new structures.
- Structural changes to an existing building.
- Certain improvements classed as a structure.
Where Section 87 applies, approval may be obtained by a resolution without dissent or written approval from all lot owners.
What about smaller renovations?
Even minor works may require approval under your scheme’s by-laws, particularly where they affect:
- External appearance.
- Common property.
- Structural elements.
- Flooring, waterproofing or attached fixtures.
What information may be required?
Your strata manager may request:
- Details of the proposed works.
- Plans or specifications.
- Photos and dimensions.
- Details of any impact on common property.
Before you start
Contact your strata manager before engaging contractors or commencing work. We have online forms that assist with this. https://www.abodestrata.com.au/forms
This will help confirm what approvals and supporting documents are required. Checking first can help avoid delays, disputes and costly issues later.